USDA Forest Service

Description

Solar Well Conversion Project – Hiawatha National Forest

Project consisted of the removal of a 2 panel “Non Pressurized” solar pump system from the site, converted and reinstalled to a pressurized system at the new location. This consisted of erecting a pump house building, setting 2 solar panels on a 40’ power pole, trenching underground UV cable, installation of a DC pump in well casing with pit-less adapter. Wired and plumbed pump house for functioning water system.

IMS Michigan (Home) Office

1920 20th Ave. North
Escanaba, MI 49829

Phone & Fax

Phone: (906) 789-9021
Fax: (906) 789-9129