Cleveland Cliffs – United Taconite – Forbes, MN

Pellet Reclaim System Hopper Foundation

Project consisted of the removal of conveyor 22Z and discharge chute to specified location, verify and modify grade as required, provided all equipment, labor and materials to prepare site for installation of the foundations, installation of the foundations, fabrication and installation of structural steel and reinstall conveyor 22Z and Feed Hoppers.

 

Mailing Address:

PO Box 369
Wells, MI 49894

Physical Address:
1920 20th Ave North
Escanaba, MI 49829
Phone & Fax:
Phone: (906) 789-9021
Fax: (906) 789-9129