U.S. Army Corps of Engineers – Dead River Basin – Marquette, MI
Dead River Flood Clean Up
Removal and disposal of timber piling field crossing the Dead River. Removal and chipping of woody debris deposited by 2003 flood event.
- Phase I: Installation of 300’ of turbidity curtain & floating containment boom. Removal and disposal of 350 timber pilings. Removal and disposal of 72 tons of woody debris.
- Phase II: Removal and chipping of 16,400 cubic yards of woody debris.
- Phase III: Removal and chipping of 28,104 cubic yards of woody debris.
- Phase IV: Removal and chipping of 19,979 cubic yards of woody debris.
- Phase V: Removal and chipping of 36,176 cubic yards of woody debris.