City of Gainesville – Loblolly Woods Park – Gainesville, FL
Boardwalk Reconstruction
This project consisted of the reconstruction of approximately 1,400 LF of boardwalk located in Loblolly Woods Park. The scope of work included removing and replacing all the decking, sideboards, top handrail and 2”x 6” joists. This project also included replacement of 6 posts and their concrete footings at the main water crossing. The new concrete footings utilized 24” Sonotubes buried 3’ into the ground along with replacement of 4 beams and replacement of all the bridge span members at the main water crossing. The bridge span includes (8) 2”x10”x16’ beams, and (10) 2”x10”x12’ beams.