State of Michigan – Marenisco, MI
Presque Isle Dam Replacement
The scope of work included: existing steel skin and all channels of both Tainter gates were removed and replaced, bolts were removed and replaced, and the top steel angle support arm was strengthened. The existing concrete was cleaned by hydro-washing, two coats of epoxy was then applied to selected areas of the existing walls.