U.S. Department of Veterans Affairs – Aleda E. Lutz VAMC – Saginaw, MI
Mixing Valve & Medical Gas Building 22
This project was located at the Aleda E. Lutz VA Medical Center. The project consisted of complete preparation of site for building operations, including demolition and removal of existing infrastructure, and furnishing labor and materials and perform work for Mixing Valve and Medical Gas Install Bldg. 22 as required by drawings and specifications. Work included, but was not limited to, mechanical, electrical, plumbing, and medical gas.